The public pool was originally built back in the 1940s and hasn’t seen a swimmer since before the pandemic started. Hopkins is proposing a multi-phased redevelopment, with a goal of getting the pool back open by summer 2024, but the $3.5 million price tag is getting pushback from some city officials.

Share.

Production engineer and certified swim coach. Full-time IT consultant, spare-time swimming aficionado. 2 sons, 2 daughters and a wife. President of the Faroe Islands Aquatics Federation. Likes to run :-)

Leave A Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version